机械荟萃山庄

 找回密码
 立即注册

QQ登录

只需一步,快速开始

搜索
热搜: 活动 交友 discuz
查看: 25|回复: 0

SOLIDWORKS仿真助力Com-Pak Plus

[复制链接]

2万

主题

3万

帖子

22万

积分

超级版主

Rank: 8Rank: 8

积分
227554
发表于 前天 18:47 | 显示全部楼层 |阅读模式
Com-Pak Plus designs high-precision garbage compactors for demanding Indian road conditions. General Manager Chethan Lingaraju detailed their shift from legacy two-dimensional drawings to a modern simulation approach. Early in their development cycle, the company experienced structural failures in the field.

The packer frame on their machines endures heavy cyclical loading, handling massive pressure on every cycle. Two hydraulic cylinders exert up to 170 bar of pressure, placing intense stress on the metal structures. Over time, this sustained load caused material fatigue and outward buckling at the points of maximum stress concentration.

To solve this problem, Chetan integrated virtual stress testing into the development of Com-Pak Plus’s new 42-cubic-meter compactor. By validating critical sub-assemblies like the ram ejector before manufacturing, they identified exactly where the frame needed reinforcement. This proactive engineering cycle reduced their development time from two years to less than three months. They also achieved zero market failures with the newly optimized design.



回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

QQ|小黑屋|手机版|Archiver|机械荟萃山庄 ( 辽ICP备16011317号-1 )

GMT+8, 2026-8-26 01:34 , Processed in 0.066339 second(s), 19 queries , Gzip On.

Powered by Discuz! X3.4 Licensed

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表